Pressure pipeline Hoofddorp
Piping systems
Persleiding Hoofddorp

Around Hoofddorp, it was necessary to replace an existing pressure pipeline. Our client chose to use two temporary pipelines from VandeGrijp. In total, a temporary pipeline system of 7 kilometers was realized.

Because the route crossed several roads, road overpasses with supports were installed at various locations. A particular challenge in this project was bridging a 40-meter-wide ditch. For this, a temporary pipeline bridge was designed and custom-fabricated in collaboration with the client. Using a heavy telescopic crane, this bridge was precisely placed in position.

Throughout the project, we solved several engineering challenges together with the client. In addition, crane assistance was provided at various locations to fully relieve the client of any concerns.

Features:

Project location

Hoofddorp

Project period

Approximately 1.5 years

Diameter

600mm and 700mm 

Length

about 7 km

Application

Temporary bypass of wastewater
Thomas 3

Contact us

Would you like to know more about this product or request a quote right away?

View more projects

We are there when things get tough: when quick action, availability, and clear communication make the difference. An urgent job with a temporary pump installation or a long-term coastal defense project with multiple split barges? Here you get a clear picture of our projects!

Pro Contact VanDeGrijp 42

Strategically positioned. Rapidly mobilised.

With yards and harbour facilities in Papendrecht and near Hull in the UK, VandeGrijp Rental is strategically positioned to mobilise quickly for projects across Europe.

We are ready when you need us, respond quickly and deliver on our commitments.