Split hopper barges 360mseries

split hopper barges are suitable for transporting sludge, sand, clay, or gravel. With proper sealing, the split hopper barges of 363 m³ are suitable for any dredging project.

All split hopper barges have a valid community certificate for Zone 2NL, 3, and 4 EU and the Rhine, a hold certificate, and a measurement certificate. The split hopper barges are equipped with a wireless remote control, a hydraulic anchor winch, and overflow valves in the hold.

Trunk contents

363 m³

Length

46.08 m

Width

8.04 m

Cavity

2.80 m

Draft empty

0.70 m

Depth loaded

2.75 m

Air draft with empty vessel

4.20 m

Maximum load capacity

671 tons

Working length

30.00 m

Recess width

5.35 m

Class notation

I HULL ∙ MACH – SPLITHOPPER UNIT, NO PROPULSIONCOASTAL AREA, DREDGING WITHIN 8 MILES FROM SHORE

When do you choose a split hopper barge?

split hopper barges temporarily store dredged material and then open along their length to discharge the load in a single motion. This shortens dumping cycles, minimizes downtime, and keeps your dredging or infrastructure project strictly on schedule.

Applications of split hopper barges

Dredging operations: Efficient transport of dredged material, such as silt, sand, and gravel, for:

  • Constructing or deepening harbors
  • Building locks
  • Constructing tunnels
  • Dredging rivers

Why rent split hopper barges from us?

  • Quality and reliability
  • Flexible rental options
  • Certification for inland and sea navigation